First-class after sale service
Our Company have attached great importance to the quality of our PVIP exam preparation files, at the same time, we firmly believe that first-class service is the key for us to win customers in the international market, so our company will provide exquisite technology and strict quality control along with first-class after sale service to our customers. In other words, you really can feel free to contact with our after sale service staffs if you have any questions about our PVIP study guide files, we can ensure you that you will get the most patient as well as the most professional service from our staffs. If you feel excited about our advantages of our PVIP practice test: PV Installation Professional (PVIP) Board Certification you can take action so as to make great progress now.
After purchase, Instant Download: Upon successful payment, Our systems will automatically send the product you have purchased to your mailbox by email. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)
Preferential price
Even though the sales of our PVIP practice test: PV Installation Professional (PVIP) Board Certification have maintained the top position for more than 10 consecutive years, we are always trying our best to make our PVIP exam preparation files more valid and useful for all of the workers in this field who are preparing for the meaningful exam. In addition, offering discounts in some important festivals for our customers is another shining points of our PVIP study guide files. If you want to buy the high quality study material for the exam with the minimum amount of money, just choose our PVIP training materials: PV Installation Professional (PVIP) Board Certification. Do not hesitate anymore!
Immediate delivery
"The Eternal pursuit, endless struggle." is the tenet of our company. That is why we are continuously in pursuit of improvement in our operation system.(PVIP practice test: PV Installation Professional (PVIP) Board Certification) During the ten years, we have spent lots of time and energy on improving technology of our operation system in order to ensure the fastest delivery speed, and we have made great achievements now. We can assure you that you can get our PVIP exam preparation within 5 to 10 minutes after payment, that is to say you can start to prepare for the exam with the most effective and useful study materials in this field immediately after you pay for our PVIP study guide files.
We believe that almost all of the workers who have noble aspirations in this field would hope to become more competitive in the job market (without PVIP practice test: PV Installation Professional (PVIP) Board Certification) and are willing to seize the opportunity as well as meeting the challenge to take part in the exam in your field since it is quite clear that the one who owns the related certification (PVIP exam preparation) will have more chances to get better job than others. Nevertheless, the confusing and difficult questions in the exam serve as the tiger in the road. Now our company is here to provide the panacea for you—our PVIP study guide files. Our PV Installation Professional (PVIP) Board Certification certification training files have been rewarded as the most useful and effective study materials for the exam for nearly ten years. In order to let you have a better understanding of our company's products, I list some of the advantages of our PVIP practice exam files for you.
NABCEP PV Installation Professional (PVIP) Board Certification Sample Questions:
1. A PV system is designed with a 48V battery bank and a 5 kW inverter. The load requires 20 kWh/day, and the system must have 2 days of autonomy with a maximum depth of discharge (DoD) of 50%. What is the minimum battery capacity required in Ah?
A) 1000 Ah
B) 833 Ah
C) 1667 Ah
D) 417 Ah
2. A project is using a PV module with a 25-38dc maximum power voltage range and a single input inverter with an operating windows of 250vdc-450dc. The dwelling the system is to be installed on has a 5:12 roof with a southeastem face that can accommodate 14 modules and southwestern face that can accommodate 10 modules. What is the MAXIMUM number of modules that can be installed for proper inverter maximum power point tracking?
A) 18
B) 14
C) 20
D) 24
3. A PV system's annual energy production is 15,000 kWh. After maintenance, production increases by 5%.
What is the new annual output?
A) 16,000 kWh
B) 16,250 kWh
C) 15,750 kWh
D) 15,500 kWh
4. A grid-interactive PV system with battery backup is being installed with a ground-mounted PV array located
200 ft, from the inverter and batteries. The dc PV output circuit has overcuit has overcurrent protection rated from 30A. To reduce voltage drop between the array and batteries, the output circuit wire size was determined to be 6 AWG. The fused dc disconnect between the inverted and batteries is rated for 300A. What is the required size of the equipment grounding conductor between the metal battery case and the inverter?
A) 4 AWG
B) 8 AWG
C) 10 AWG
D) 6 AWG
5. A PV system uses 10 AWG USE-2 wire for a 150-foot source circuit run with an Isc of 8A. The terminals are rated at 75°C. What is the ampacity of the conductor after applying NEC temperature and conduit fill adjustments at 35°C?
A) 30A
B) 40A
C) 35A
D) 45A
Solutions:
| Question # 1 Answer: B | Question # 2 Answer: C | Question # 3 Answer: C | Question # 4 Answer: A | Question # 5 Answer: C |

PDF Version Demo





